Feasibility Study for Hospitality Retreat in Tuscany

Project Description
Mille Pini Tuscany Feasibility Study
Project Type
Development Advisory
Country
Italy
The Client
The client, based in Italy, owns a 20-hectare property approximately 34 miles south of Florence.
Background
The client was looking to develop a hospitality retreat comprising a Club House, 82 hotel suites and associated facilities. The Client had obtained planning approval, had preliminary plans and costings for the development and wanted to assess the viability of such a development.
Client Need
The client requested that HSP undertake a feasibility study to assess the hotel’s viability.
Scope of Work
Our process comprised three phases:
Phase 1 – Market Study
- We acquired and analysed macroeconomic, investment, and tourism data and conducted hotel supply and demand research. Desktop research was carried out for a selected competitive set of hotels either in the local area or those considered competitors, given the broader target parameters.
- Two of our consultants travelled to Tuscany to view the site and conducted field research to understand the site parameters and constraints, access, market environment, and, where appropriate, to map hotel competition.
Phase 2 – Concept Review
- Our team interfaced with the Client’s design team to understand and provide feedback on the current area program, including the number, size, and mix of guest rooms and facilities for the hotel.
- We reviewed the market and assessed additional options that could be considered, given current hotel trends and successful concepts.
Phase 3 – Financial Projections
- HSP established price/quality positioning for the proposed hotel and projected likely average daily rates and occupancy levels. Ideally, this was based on competitor set data purchased from a recognised industry source.
- We prepared a 5-year forecast of income and operating costs based on cost ratios for hotels of comparable scale and concept in the region. Again, this was also based on competitor set data purchased from a recognized industry source. The forecasts were prepared in accordance with the Uniform System of Accounts for the Lodging Industry, the standard reporting method applied by the hotel industry, and showed Gross Operating Profit and EBITDA.
- HSP computed the project’s Return on Investment (ROI) by preparing a simple unleveraged (pre-tax) ROI computation based on stabilized year projected EBITDA and assumed development costs.
The total elapsed time for delivering our draft feasibility report was within 5 weeks from the site visit.
What did Hotel Solutions Partnership achieve for the client?
HSP’s feasibility study gave the client a robust analysis of market demand and supply in Tuscany. This enabled our client to conceptualise a development that meets the demand for wellness and sustainability in a serene forest environment. Our study helped the client secure a world-class operator and planning consent from both local and regional authorities.











Follow